Solution:Biological Oxygen Demand (BOD) The approved BOD sampling and analysis procedure measure the DO depletion over a 5 day period under controlled condition (20.6 in the dark).
The test is performed using a specified incubation time and temperature. Test results are used to determine plant loadings, plant efficiency and compliance with NPDES effluent limitations : however, the duration of the test makes is difficult to use the data effectively for process control.
• Standard BOD (5 days) of industrial sewage = Standard BOD (5 days) of domestic sewage per person per day × Population equivalent.