Solution:Scrap value–It is defined as the value of an asset or property after being dismantled.
• It is generally taken to be 10% of cost of structure.
• Scrap value can be positive negative or zero.
Salvage value–It is the value of building at the end of its utility period without being dismantled.
• It can also be positive, negative or zero.