NTA UGC NET-JRF EXAM, December 2019 Paper II (HOME SCIENCE)Total Questions: 10071. Match building materials in List I whith their description in List-II. (a)(b)(c)(d)Correct Answer: (b)Solution:72. Match the movements/organisation in List I with the key persons associated with them in List II.(a)(b)(c)(d)Correct Answer: (c)Solution:73. Match terms in List I with their description in List II. (a)(b)(c)(d)Correct Answer: (b)Solution:74. Match the advocacy techniques given in List-I with their primary purposes given in List II.(a)(b)(c)(d)Correct Answer: (b)Solution:75. Match the research design in the List-I with their examples given in List-II (a)(b)(c)(d)Correct Answer: (a)Solution:76. Arrange the steps of progression in eye changes during vitamin A deficiency in the correct sequence :(1) Photophobia (2) Keratomalacia (3) Night blindness (4) Bitot's spots (5) Xeropthalmia Select the correct options :(a) (1), (4), (3), (5), (2)(b) (4), (1), (5), (3), (2)(c) (3), (4), (2), (5), (1)(d) (3), (4), (1), (5), (2)Correct Answer: (d) (3), (4), (1), (5), (2)Solution:The correct sequence of steps of progression in eye changes during vitamin A deficiency is :- • Night blindness • Bitot's spots • Photophobia • Xeropthalmia • Keratomalacia77. Arrange the steps to set the needle in sewing machine in the correct sequence :(1) Hold needle in the left hand (2) Loosen thumb screw on needle bar (3) Tighten clam (4) Insert needle through needle clamp (5) Raise needle bar to highest by turning fly wheel (6) Keep flat side of needle towards groove Choose the correct option : (a) (1), (3), (4), (5), (6), (2)(b) (5), (2), (1), (6), (4), (3)(c) (4), (6), (5), (2), (3), (1)(d) (6), (4), (3), (5), (1), (2)Correct Answer: (b) (5), (2), (1), (6), (4), (3)Solution:Correct sequence of the steps to set the needle in securing machine is :- • Raise needle bar to highest by turning fly wheel. • Loosen thumb screw on needle bar. • Hold needle in the left hand. • Keep flat side of the needle toward groove. • Insert needle through needle clamp. • Tighten clamp.78. Arrange the steps of cocoon processing for silk yarn production in the correct sequence :(1) Spinning (2) Degumming (3) Throwing (4) Weighting (5) Sorting (6) Reeling Choose the correct options :(a) (1), (2), (3), (4), (5), (6)(b) (3), (5), (6), (2), (1), (4)(c) (5), (6), (3), (1), (2),(d)(d) (6), (5), (4), (3), (2), (1)Correct Answer: (c) (5), (6), (3), (1), (2),(d)Solution:Correct sequence of steps of cocoon processing for silk yarn production is:- • Sorting • Reeling • Throwing • Spinning • Degumming • Weighting79. Arrange the steps involved in preparation of a time plan in correct sequence :(1) Estimate time requirement for each activity (2) List all flexible and inflexible activities (3) Determine time sequence (4) Finalise the time schedule (5) Balance total estimated time with time available Choose the correct option : (a) (1), (2), (4), (5), (3)(b) (2), (1), (5), (3), (4)(c) (4), (1), (2), (3), (5)(d) (1), (3), (2), (5), (4)Correct Answer: (b) (2), (1), (5), (3), (4)Solution:The correct sequence of steps involved in preparation of time plan is :- • List all flexible and inflexible activities. • Estimate time requirement for each activity. • Balance total estimated time with time available. • Determine time sequence. • Finalise the time schedule.80. Arrange the following steps of design process in correct sequential order :(1) Design development (2) Schematic design (3) Programming (4) Construction administration (5) Construction docume Choose the correct options : (a) (4), (1), (2), (5), (3)(b) (1), (2), (3), (4), (5)(c) (3), (4), (1), (5), (2)(d) (3), (2), (1), (5), (4)Correct Answer: (d) (3), (2), (1), (5), (4)Solution:The correct sequence of steps of design process are :- • Programming• Schematic design• Design development• Construction documentation• Construction administration Submit Quiz« Previous12345678910Next »